MV HUA LI

Boarded the said vessel on 2 January 2018 1300hrs to unberth her with final 11 metres draft and 186 metres in LOA from BCT to North Channel. Once the tugs attached the unmooring was executed to final 1 x 1 lines.

Finally all lines were cast off, the tugs started to pull her out but due to the strong winds and current,  the vessel moves slowly ahead with stern slowly to wharf.  The tugs and engine were used with vary piloting orders to bring her out safely.

At 1345hrs she was safely piloted out of the wharf area and proceed to North Channel. The Master was advised to increase her 7 knots speed in order to safely guided her passing through the channel within the flood tide time frame.

Finally she was safely piloted out of the channel and disembarked at 1545hrs.

Comments

Popular posts from this blog

Kepimpinan melalui teladan

Penambahbaikan Diri Untuk Kerjaya & Syarikat

PEMBENTUKAN SEMANGAT BERPASUKAN